Skip to product information
1 of 9

Book Mobile Milling

Book Mobile Milling

We mill at $500/cubic metre of usable timber (incl GST).

Alternatively, we mill at a day rate of $1,000 (incl GST) if you'd prefer to work on the clock. (This may suit those who operate machines to load timber onto the mill, stack, or organize timber, to mill as much as we can in our timeframe.)

We can mill about 2 cube per day or 4 average size logs without heavy machinery.

After plugging your measurements into our cubic metre calculator you can get a rough quote for the cost of milling your logs.

Quick Quote Calculator




 

Ben can be reached at 0477552485 for inquiries and bookings.

To save time, text your name, a few photos of the logs, and your local area.

Elevate your biggest logs onto 200mm gluts, and keep the logs at least 2m apart for quick setup, or in a pile to be rolled easily under the mill.

View full details